Thursday, December 12, 2013

Ethiopia- Kerfe School Complete!!!!

We are thrilled to announce construction on our new school in Kerfe is complete!!!
 
 
The village of Kerfe is located two hours off any main roads and is the first school to ever be built in the region. After it's grand opening this week, we have already began teaching 120 students in grades 1-4. This is the first time any of those children have ever been able to go to school or receive any kind of an education. We anticipate enrollment to be over 200 students by the end of the school year. 
 
 
This Kerfe School was an exciting project for us to build because it is the first block school we have ever constructed. After building schools in rural Ethiopia for over 12 years, we recently learned that building them with blocks rather than concrete will be more cost effective and sustainable throughout the years. So, after successfully completing this school, we will be using it as the prototype for all future ENA schools.
 
 
We look forward to everyone's continued donations and support to help keep these students learning and attending school. An education really is the only key to their future. With your support, we will be able to ensure each student in this region receives an education, has one new pair of clothing to wear to class, has shoes to walk to school in every day and has the proper school supplies necessary for success!
 
 
Thank you to everyone who helped fund and construct ENA's latest school!

Wednesday, December 4, 2013

Ethiopia: Keloid Removal Surgery Success Story





During ENA's June 2013 expedition to the Village of Teddecha, we discovered a young boy named Taddeles who had a large keloid near his right ear. Taddeles is ten years old and after his mother passed away when he was one years old, his father has been raising him on his own. Taddeles' father said that he first noticed the keloid when Taddeles was four and he has watched it steadily grow throughout the past six years.  
 
Taddeles' keloid was removed on August 3, 2013 and the surgery went very well!
 
We received numerous reports that Taddeles' incision was healing wonderfully and he was also enjoying the new clothing and shoes he received from ENA to attend school.
 
During a follow up visit to the village of Teddecha this month, we were finally able to meet up with Taddeles to check on his progress for ourselves.
 
We are thrilled to show you how Taddeles' right ear looks now! 
 
Thank you to all of the doctors,  nurses and ENA staff who help Taddeles' recovery a success!

 

Monday, July 1, 2013

June 2013 Expedition- Village of Teddecha, Ethiopia

We would like to say a big thank you to everyone who made our latest expedition to Ethiopia a great success!!!


We had 18 participants who came from all over the United States to volunteer in the village of Teddecha for six days.
 
While Engage Now Africa was in the village, we worked on many projects including:
 
 Plastering both buildings in the school
 
Painting the school both inside and out, including all 6 classrooms
 
 
Outfitting each classroom with enough supplies for each student for the entire school year
 
Our donations included: A new chalk board, backpacks, basic school supplies, art supplies, educational posters, soccer balls and a radio to enhance the students' education through Ethiopia's educational radio programs.
 
 
 
 

 



Building, sanding and varnishing 80 student desks
 
 
 
 
Supplying all 200 students and orphans with clothes and shoes so they will now have clothes to attend school
 
  Each girl received a new dress and shoes and every boy received a new shirt, pair of pants and shoes.
 
 
 
 
 
 
 
 
 
Painting the school with maps and murals
 
 
 
Teaching personal hygiene, life skills and health education classes
 
 
 
During down time, participants could always be found playing soccer and volleyball, beading necklaces, painting nails with the girls and teaching each other both American and Ethiopian games (Duck Duck Goose was a big hit this year!)  
 
 
 
 
 
 
 
We were also very happy to be able to fulfill two special donations for this specific village. The first was a donation of baseball caps and sunglasses for all of the farmers to help avoid cataracts. The second was to provide sewing kits to all of the women in the village.
 
Finally, we were successful in locating a few children who will be the recipients of much needed medical operations and procedures.

Thank you again to all of our participants, translators and staff who helped make this expedition so successful. We hope that you enjoyed your time volunteering with our organization as much as we enjoyed working with and getting to know you!

Wednesday, April 10, 2013

Ghana- Wells



 Engage Now Africa has been hard at work since 2011 installing high quality wells that provide clean water to thousands of villagers in Northern Ghana. Northern Ghana is the poorest part of Ghana and our wells are located in three different districts 1-2 hours outside of Bolgatanga, Ghana. These areas were determined to be where villages need access to clean, continuous water most.

When ENA and Ayindisa, LLC. discovered that three out of five wells in these regions were not functioning and did not have any water in them they knew they had to react. Some wells have not worked for over a decade. Most of the existing wells were built with good intentions by local governments and other NGO's, but without a proper plan or contractor so they only functioned for a brief time.

Below are pictures of the old, existing wells...

 Most were not functioning and if they were the water was not clean or safe to consume.

Process of Drilling Wells
ENA works with a drilling company in Ghana that specializes in digging high quality wells. They have a machine that locates water within each village and drills deep into the earth where the long term water supply is. This ensures year round water availability through both the dry and rainy seasons. They are guaranteed for life by the company and any needed maintenance or repairs are done with original manufactured parts by this company. The company also tests the water to make sure it is safe to drink once it is found. If the water that comes back from lab is determined to be unsafe then they provide the necessary medicine and treatments to ensure the water safe to drink.

Below are pictures showing the process of drilling the wells.
The best location for a long term water source is located and drilling begins.

Water is struck!


The site is capped off and a cement foundation is built around the site.

Once the foundation is set, a high quality pump is installed and clean water can be easily and continuously pumped as needed.

Well Maintenance
In order to ensure the wells are properly maintained, ENA organized community maintenance and well care taker committees that help keep the wells clean and in good working condition all year. The villages themselves donate time and some money to help with maintenance of parts so as to be responsible and invested owners of their wells. This pump was not charity. It is an investment and partnership with Engage Now Africa and the Community. Groups are typically organized in youth groups, adult groups and elderly groups so the whole village is involved and participating in keeping the well clean and safe from damage or abuse.

Ghana Well Timeline
Well 1: First Ghana bore hole well was completed and commissioned November 25th, 2011 in Yarkibisi, Ghana with donations from Engage Now Africa and Ayindisa, LLC.
Wells 2-5 were all made possible by generous donations to Engage Now Africa.
Well 2: completed March 11, 2013, outside Bolgatanga, Ghana.
Well 3: completed March 12, 2013, Bongo Soe, Ghana.
Well 4: completed March 13, 2013, Binbinibisi, Ghana.
Well 5: completed March 26, 2013, Tondonsubego, Bolgatanga, Ghana.

Dedication Ceremony and Celebration
After each well is completed, ENA and villagers have a dedication ceremony followed by a celebration. One can only imagine the joy these villagers must feel after receiving such a life changing gift.

Below are pictures displaying the dedication ceremony for the well inYarkibisi, Ghana.


Villagers gather to demonstrate how it's used and to celebrate!!

Villagers were overcome with joy for the life changing blessing of having easier access to clean water. After this particular dedication ceremony, a group of women and children gathered together to dance, celebrate and shout the phrase "water is life"!

This past March, Engage Now Africa & Ayindisa, LLC. staff did a follow up site visit to and check on the well in Yarkibisi, Ghana and meet with the community. 

Below is the personal account of this visit by Chris Gay (Director of Operations for West Africa)...

"One year and 3 months has passed since this well was dedicated and it continues to pump an estimated 500-600 gallons of water a day. For two and a half hours I watched villagers, children, older women and men collect water to drink, wash, bathe and give it to their animals. The pump and water flowed non-stop. Water truly is life and this pump has changed the village in significant ways.

The first thing I noticed immediately was that the community had planted a garden at the end of the well where the excess water runoff is collected. It was beautiful to see this garden that never used to exist. Now the garden has pumpkins and other vegetables growing for the community to share and eat.

I also noticed how clean the whole area was and how good the pump looked and how it was still working.

 Older women told us how their backs do not hurt anymore because they are not carrying water for long distances. Parents and children told us how the can now bathe both in the morning and evening (before they could only bathe 1-2 times a month). This ability has especially made the children more awake and prepared for school as well as given them more time to play, work and study instead of wasting hours a day or missing school because they had to fetch water. They can wash their clothes much more frequently and easier, give water to their animals, drink freely for themselves and much more."